Lingnan: Beauty Beyond Borders | The #Shenzhen-Zhongshan Link, a major national project, was put into trial operation at 3:00 pm on June 30. At around 12:00 noon, three hours before the commissioning of the project, its builders and their #family members departed from Cuiheng in Zhongshan took eight special vehicles to experience the Shenzhen-Zhongshan Link before the commissioning. In the first hour after the opening of the link, a total of over 7,000 vehicles passed through both sides of #Zhongshan and Shenzhen. #SplendidLingnan
6月30日,国家重大工程深圳至中山跨江通道已于15时通车试运营。在通车试运营前3小时的中午12时许,从中山翠亨东站,8辆载满深中通道建设者及其家属的建设者专列,在通车前“抢鲜”体验深中通道。深中通道开通后第一个小时,中山、深圳两侧共有超7000车次通过。